
Add to Cart
KEL - AS1200T Antimicrobial Air Shower Tunnel Single Person With Two Side Blowing
Quicky Detail:
External Size : 1200x3000x2180mm
Internal size: 800x2860x1910mm
Aluternative type : Single person with two side blowing
Purification rank: Class100
HEPA filter efficiency: 99.999%@0.3um
Personal per cycle: 3--6 person
SUS nozzle: 36pcs
Blower way: Two side blowing
Air speed :>25m/s
Power: 380V/50HZ Or 380V/60HZ
Introduction:
The greatest source of particulate contamination in a clean room is the operator air shower tunnel are installed between change areas and the clean room, the air shower tunnel enhances clean room operating protocol by serving as a reminder to all operators that they are entering a controlled environment, personnel should be gowning up properly before entering the air shower tunnel , after you pass the air shower
Applications:
It can keep pharmaceutical, semiconductor, micro-electronics production and lab animal breeding areas clean and also minimize egress of hazardous substances and allergens from the controlled environment.
Specification:
KEL-AS1200T-3 Air shower Tunnel | ||
Model | KEL-AS1200T-3 | |
External size(mm) (WXDXH) | 1200x3000x2180 | |
Work zone (mm)(WXDXH) | 800x930x1910 | |
Persons per cycle | 1-2 person | |
Air shower Duration | Factory set at 12 second (adjustable) | |
Material | 1: Entirety Sus304.(T=1.0/1.2mm 2: External is steel with power coated, Internal is SUS304.(T=1.0/1.2mm) 3: External is steel with power coated. Internal is SUS201. (T=1.0/1.2mm) | |
Fan consumption | 0.75KWX3 set | |
Air flow of fan(m3/h) | 1300m3/h | |
Fan run (r/min) | 2800r/min | |
Nozzle in stain less steel | 36 pcs | |
Wind speed(m/s) | > 22-27m/s | |
Noise level(dB) | <62dB | |
LED Fluorescent Lamp | 20wx3 | |
HEPA Filter | Size(mm) | 630X630X69mm |
Efficiency | 99.99%@0.3um | |
Air velocity | 1000(m3/h) | |
Resistance | <220pa | |
Pre-filter | Size(mm) | 785x385x21 |
Efficiency | 75% @ 5um | |
Resistance | <30 Pa | |
Electrical | Power supply | 380v/50Hz OR 380v/60Hz |
Customer’s design is available. |
Factory test:
All of equipment is individually factory tested for safety and performance
in accordance with international Standards. Each unit is shipped with a documentation outlining the tests undertaken and the units individual results for each unit.
Factory test include:
-- functional test and visual inspection
-- electrical safety tests
-- air velocity testing
-- purification rank test (if need)
Warranty:
Our equipment is warranty for 1 year excluding consumable parts and accessories.
All equipment is shipped with a comprehensive use’s manual complete with a report documenting all test procedures.
Additional IO/OQ/GMP document is available upon request.
Contact our sales representative for specific warranty details or document request.
Consumable parts illustration:
1: Pre-filter: each one should be replacement in each 6 month, but it can refresh no more three times.
2: HEPA filter: each one should be replacement in each half and one years.
Why you choose K-LING Company ?
Professional sales:
• We value every inquiry that you sent to us, ensure quick competitive offer.
• We cooperate with customer to bid tenders. Provide all necessory docuement.
• We are a sales team, with all techinical support from engineer team
Punctual delivery time:
• Production / inspection report provide before shipment
• Shipping notice or insurance for you when your goods is shipped.
After sales service:
• We respect your feed back after receive the goods.
• We provide one year warranty after goods arrive.
• We promise all spare parts available in lifetime use.
• We care of your complain within 48hours.
Payment Term:
T/T in advance, 30% before place the order, 70% when you see copy BL
Or 30% T/T in advance before place the order, 70% LC at sight.